Projects
 
FSO Hull and Riser Inspection - Oct 09
 
Using an ISV moored alongside the FSO as a platform, we surveyed the entire FSO hull along with the turret, buoyant arches, mid-depth buoys and gravity bases. Water depth was 80m.
The Percussive CP Probe achieved readings first time on 95% of the sites, whilst the new high power LED lights boosted video quality.
 
 
Our Latest Projects
Interim Field Inspection - Jan 2010
Two wellheads, a manifold and a turret all inspected in a single shift to the clients satisfaction.
FPSO UWILDS - Nov/Dec 09
Complementing the divers on one, whilst completing the other standalone we recently completed two FPSO UWILDS
FSO Hull and Riser Inspection - Oct 09
Working from an infield support vessel moored alongside the FSO, Intervention Engineering completed a full inspection of the Hull and Riser system.
Full Field Inspection Sept 09
Using our clients vessel, Intervention Engineering provided ROV, Survey and Inspection Services for the full field inspection.
 
Media Gallery